Skip to content
[email protected]
(240) 390-6707
Crunchbase icon
Twitter
Linkedin
Home
About Us
Services
Engineering & Design
Consulting
Project Management
Design & Build
Portfolio
Offshore Supply Vessels
Dredges
Cargo Transport Vessels
Patrol Vessels
Barges
Tug and Towboats
Passenger Vessels
Specialty Vessels
Research Vessels
KOMB EnviroMax™© Series
KOMB’s TOW System
Careers
Contact Us
Menu
Home
About Us
Services
Engineering & Design
Consulting
Project Management
Design & Build
Portfolio
Offshore Supply Vessels
Dredges
Cargo Transport Vessels
Patrol Vessels
Barges
Tug and Towboats
Passenger Vessels
Specialty Vessels
Research Vessels
KOMB EnviroMax™© Series
KOMB’s TOW System
Careers
Contact Us
Home
About Us
Services
Engineering & Design
Consulting
Project Management
Design & Build
Portfolio
Offshore Supply Vessels
Dredges
Cargo Transport Vessels
Patrol Vessels
Barges
Tug and Towboats
Passenger Vessels
Specialty Vessels
Research Vessels
KOMB EnviroMax™© Series
KOMB’s TOW System
Careers
Contact Us
X
Offshore Wind Solutions
KOMB’s TOW System
Overview
TOWS Process
Solution Benefits
Solution Benefits
Cost-Effective: Offers a lower $/kWh compared to other systems.
Safety and Ease: Simplified installation and maintenance.
Proven Technology: Utilizes a buoyant tower substructure, based on the oil and gas Spar platform.
Versatile Design: Adaptable to various water depths and environmental conditions.
Innovation & Impact
Provides a safe, reliable, and cost-efficient platform for deep water wind turbine installations.
Scalable to accommodate larger turbines and deeper water (up to 300 meters).
Key Technological Challenges Addressed:
Design adjustments for varying water depths using ballast.
A flexible control system adaptable to different environmental conditions and configurations.
Development of versatile installation vessels for various offshore projects.
Design and analysis of a taut guy mooring system.
Cost modeling for different payloads (wind turbines) and water depths.
Key Facts:
The tower is designed to be towed out as a single unit.
Lighter than traditional platforms like TLBs, Spar-Buoys, or Semi-Submersibles.
Installation is expected to be completed in under a week, potentially using an assembly line approach.
Patented technology by KOMB.